Road II/380 in stage Moutnice – Borkovany - relocation study
Charvátová, Marie ; Valentova, Veronika (referee) ; Radimský, Michal (advisor)
Relocation the road II/380 Moutnice – Borkovany is designed for higher traffic load centers municipalities Těšany and Moutnice, increase driving safety in the community and increase traffic flow. Part of Master´s thesis is the connection of intersecting roads 2. and 3. clases and connections to existing transport infrastructure. Relocation the road II/380 is made in three variants. Better alternative is developed in more detail. Relocation is designed in the category S7,5/70.
Bypass Pelhřimov west
Dočkal, Pavel ; Hrazdira, Oldřich (referee) ; Holcner, Petr (advisor)
Final thesis deals with relocation of road I/34, specifically bypass Pelhřimov west. The crossing with roads I/19 and I/112 is solved by interchange roundabout in nothern part of bypass. Reason of construction is unification road I/34, which is a part of the international route E551, to category S11,5/70. The principal tasks was to keep it in the land use plan and the effort to maximize the alignment of volumes of earthworks.
Construction technological project of road and a bridge across of motorway
Schindler, Marek ; Klimszová, Alžběta (referee) ; Diaz, Yvetta (advisor)
This Master’s thesis deals with a construction project and a technical solution of a realignment of a stretch of a road and a bridge construction, which converts this road over the motorway D47. The aim of the thesis, is to plan the construction works in a way that ensures that they are carried out in an optimal manner. The work concentrates on the solution of the site preparation and the characteristics of the surrounding conditions of the building site. Furthermore, it deals with the time and financial plan for the implementation of individual objects and the associated number of deployment of employees and machinery. The building works consist of two construction sites of the same importance, for the road this involves a study of major technological stages of implementation and a inspection and test plan of the road construction. For the bridge, it provides a processed itemized budget, schedule of work performed, technology standard and a plan for securing material resources.
Road II/150 Domaželice - Bystřice p. Hostýnem - relocation study
Feichtinger, Lukáš ; Smítal, Petr (referee) ; Holcner, Petr (advisor)
The aim of the diploma‘s thesis is the project of relaying of road II/150 between Domaželice village and the town of Bystřice pod Hostýnem. The road continues on to the bypass of Čechy village and Domaželice village. This bypass is under construction at this time. Relaying of road II/150 is connected on project of Bystřice pod Hostýnem bypass. The connection of the existing and intended roads is designed. The project includes the accompanying report, the drawing part and the photodocumentation. The project is drawning up in two programs called Bentley Inroads and AutoCAD according to valid standards.
Bypass Pelhřimov west
Dočkal, Pavel ; Hrazdira, Oldřich (referee) ; Holcner, Petr (advisor)
Final thesis deals with relocation of road I/34, specifically bypass Pelhřimov west. The crossing with roads I/19 and I/112 is solved by interchange roundabout in nothern part of bypass. Reason of construction is unification road I/34, which is a part of the international route E551, to category S11,5/70. The principal tasks was to keep it in the land use plan and the effort to maximize the alignment of volumes of earthworks.
Construction technological project of road and a bridge across of motorway
Schindler, Marek ; Klimszová, Alžběta (referee) ; Diaz, Yvetta (advisor)
This Master’s thesis deals with a construction project and a technical solution of a realignment of a stretch of a road and a bridge construction, which converts this road over the motorway D47. The aim of the thesis, is to plan the construction works in a way that ensures that they are carried out in an optimal manner. The work concentrates on the solution of the site preparation and the characteristics of the surrounding conditions of the building site. Furthermore, it deals with the time and financial plan for the implementation of individual objects and the associated number of deployment of employees and machinery. The building works consist of two construction sites of the same importance, for the road this involves a study of major technological stages of implementation and a inspection and test plan of the road construction. For the bridge, it provides a processed itemized budget, schedule of work performed, technology standard and a plan for securing material resources.
Road II/150 Domaželice - Bystřice p. Hostýnem - relocation study
Feichtinger, Lukáš ; Smítal, Petr (referee) ; Holcner, Petr (advisor)
The aim of the diploma‘s thesis is the project of relaying of road II/150 between Domaželice village and the town of Bystřice pod Hostýnem. The road continues on to the bypass of Čechy village and Domaželice village. This bypass is under construction at this time. Relaying of road II/150 is connected on project of Bystřice pod Hostýnem bypass. The connection of the existing and intended roads is designed. The project includes the accompanying report, the drawing part and the photodocumentation. The project is drawning up in two programs called Bentley Inroads and AutoCAD according to valid standards.
Road II/380 in stage Moutnice – Borkovany - relocation study
Charvátová, Marie ; Valentova, Veronika (referee) ; Radimský, Michal (advisor)
Relocation the road II/380 Moutnice – Borkovany is designed for higher traffic load centers municipalities Těšany and Moutnice, increase driving safety in the community and increase traffic flow. Part of Master´s thesis is the connection of intersecting roads 2. and 3. clases and connections to existing transport infrastructure. Relocation the road II/380 is made in three variants. Better alternative is developed in more detail. Relocation is designed in the category S7,5/70.
Přeložka silnice I/13 - D8 - životní prostředí nebo zájmy skupin?
Klaubenschalková, Dana ; Slavíková, Lenka (advisor)
V této práci půjde o problém výstavby dálničního přivaděče v Děčíně, o kterém se jedná již více let a existuje několik navrhovaných variant. Problém dálniční sítě se týká celého státu a jeho hospodářské politiky, a těch, kteří jsou zodpovědní za výstavbu a rozhodování, kde a v jakém rozsahu se bude stavět. V práci bude diskutován význam dálnic, zodpovědnost státu, jeho příslušných orgánů a kritéria rozhodování výstavby a vliv zájmových skupin na rozhodování státu a jeho hospodářské politiky. V konkrétním problému práce (děčínský přivaděč) se v současné době řeší, která varianta by byla ?nejlepší?. Jednotlivé varianty chci zanalyzovat a rozebrat především z hlediska životního prostředí, která z nich je nejšetrnější k životnímu prostředí, a dále ukázat, která varianta a z jakého důvodu se nelíbí které zájmové skupině, tedy subjektům, které mají na hospodářsko-politická rozhodnutí významný vliv. Chci tak zjistit, zda se při hledání nejvhodnější varianty shodují zájmy skupin s předpokládaným dopadem na životní prostředí, či zda hrají roli jiné aspekty stavby.